Project Highlights
- Scattered plots with slope over 50 degrees;
- PV + forestry-solar complementary
- The construction period is short; only takes 73 days to realize the connection to the grid at full capacity.
Technical Highlights
- Advanced technology leading base.
- Advanced laminated module.
- The modules are arranged horizontally, which saves cost.
- Fixed + adjustable bracket to maximize energy yield;
- Manual drilling + mechanized pile foundation construction to shorten the construction period
Product Type
Laminated module + fixing bracket
Project Type
Complex mountain PV power station