Project Highlights

  • Scattered plots with slope over 50 degrees;
  • PV + forestry-solar complementary
  • The construction period is short; only takes 73 days to realize the connection to the grid at full capacity.

Technical Highlights

  • Advanced technology leading base.
  • Advanced laminated module.
  • The modules are arranged horizontally, which saves cost.
  • Fixed + adjustable bracket to maximize energy yield;
  • Manual drilling + mechanized pile foundation construction to shorten the construction period

Product Type

Laminated module + fixing bracket

Project Type

Complex mountain PV power station