Licheng 250MW PV Power Station Project
Previous Next Project Highlights Scattered plots with slope over 50 degrees; PV + forestry-solar complementary The construction period is short; only takes 73 days to realize the connection to the grid at full capacity. Technical Highlights Advanced technology leading base. Advanced laminated module. The modules are arranged horizontally, which saves…